Skip to content

City of Dallas Alley Reconstruction Group Project (2017 Bond Program)

City of Dallas Alley Reconstruction Group Project (2017 Bond Program) includes the following alleys:

  • 1225-1423 Kirnwood Drive & 7601 S. Polk Street
  • 207-347 Bettyrae Way & 7708-7770 Ryan Ridge Drive
  • 2304-2348 Hunters Run Drive & 7407-7415 Mesa Verde Trail
  • 806-954 Ivywood Drive & 807-951 Jadewood Drive

Under this multi-project contract, Dikita provided comprehensive engineering design services for the reconstruction of the four public alleys under a single contract. Dikita served as the project manager and engineer while engaging minority subconsultants providing surveying and geotechnical services. The scope of the project included surveying, geotechnical, engineering design for paving reconstruction, drainage improvements, wastewater main replacement, erosion control, as well as utility coordination and mapping.

Owner: City of Dallas
Location: Dallas, TX
Services Provided: Project Management
Engineering
Surveying
Geotechnical
Project Cost: $1.5M
Completion Date: May 2021
Contracted Responsibility: Prime
Dikita